3. Click the Export link.
The Generate Wiring Plan window displays.
4. Specify the following export options.
a) PDF — Table, Data, Graphical Wiring Plan, or Both.
b) Visio Network Topology.
5. Click the Generate button.
Fabric Design – Step 6: Summary
The Summary screen displays a summary of your fabric design.
To export the fabric design:
1. Click one of the following export options:
Export Wiring Plan
Export Summary
Export Design
2. Select a display format: PDF (Table Data, Graphical Wiring Plan, Both) or Visio.
3. Click the Generate button.
4. Carefully review the design before you commit the changes.
5. Click Finish to commit your changes.
Next Steps
After you have designed the fabric, do the following to prepare it for deployment:
1. Check with your system administrator for the TFTP or FTP IP address. To stage the switch software images, use this
address. When you prepare the software images:
a) Make sure the software version is the same for each type of switch across the fabric.
b) Download the software image for each type of Dell Networking switch.
c) Stage the software images on the TFTP or FTP site.
2. Obtain a pool of management IP addresses from the lab or system administrator to use for the switches in the
fabric.
3. Prepare the DHCP server so that the switches can be assigned a management IP address.
4. Download the comma separate values (.csv) file that contains the switch system MAC address provided from Dell
manufacturing, if available. If not available, consult Dell customer support. If you do not have this file, record the
system MAC addresses of the switches in the fabric so that you can then map (associate) the address to the
appropriate switch before you rack the switches.
5. Print out the wiring plan and use it to rack and cable the hardware according to the fabric design wiring plan.
6. Document the location of the switches, including the rack and row.
7. Select the fabric you are performing pre-deployment on at the Network >
Fabric Name
> Configure and Deploy >
Pre-deployment Configuration screen.
Importing an Existing Fabric Design
To import an existing fabric design:
1. Navigate to the Home > Getting Started screen.
2. Click the Importing Existing Design option.
The Import Existing Design screen displays.