Dell S4810-ON Installationsanleitung Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 44
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
Figure 2. S4810–ON PSU-Side View
1. Mounting Bracket
2. Fan Module 1
3. Fan Module 2
4. Mounting Bracket
5. Power Supply (PSU2)
6. Power Supply (PSU1)
7. Grounding Screw
Orderable S4810–ON Components
You can order the S4810–ON system in several different configurations. You can also order optional
modules and optics separately.
You can order the following supported hardware components.
48-port 10G SFP+ with four QSFP+, 40G ports, one AC power supply and two fan subsystems (airflow
from I/O side to power supply side)
48-port 10G SFP+ with four QSFP+, 40G ports, one AC power supply and two fan subsystems (airflow
from power supply side to I/O side)
S4810–ON Series — Fan with airflow from the I/O side to the PSU side
S4810–ON Series — Fan with airflow from the PSU side to the I/O side
S4810–ON Series — AC Power supply with airflow from the I/O side to the PSU side
S4810–ON Series — AC Power supply with airflow from the PSU side to the I/O side
For a list of supported optics, refer to the S4810–ON data sheet at http://www.dell.com or contact your
Dell Networking representative.
Prerequisite
To successfully install the S4810–ON, ensure that you have the following components.
S4810–ON chassis
At least one grounded AC power source per chassis
Cable to connect the AC power source to the chassis (US power cables included)
Mounting brackets for rack installation (included)
Screws for rack installation and #1 and #2 Phillips screwdrivers (not included)
8
The S4810–ON System
Seitenansicht 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 43 44

Kommentare zu diesen Handbüchern

Keine Kommentare