Dell H952N Bedienungsanleitung Seite 28

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 71
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 27
28
|
Installation
AC Mains
Wall
2-pole
Breaker
UPS
Line
Neutral
Figure 19. Circuit Breaker Diagram
To hardwire the UPS input:
1 Switch off utility power at the distribution point where the UPS will be connected. Be absolutely
sure there is no power.
2 Remove the terminal block cover (four screws) and retain.
Figure 20. Removing the Terminal Block Cover
3 Punch a hole in the terminal block cover for the input conduit using a Greenlee
®
punch or similar
device. The hole accommodates 3/4 or 1 IMC conduit.
4 Pull the input wire through the conduit, leaving approximately 2 ft (0.5m) of exposed wire. Attach
a flexible metal fitting to the end of the conduit.
Seitenansicht 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 70 71

Kommentare zu diesen Handbüchern

Keine Kommentare