Step 2
Prepare Your Environment
1. Verify that your facility has adequate network wiring to provide each
storage-system storage processor (SP) with a management port Ethernet
connection.
2. Confirm that your facility has appropriate electrical wiring in place to
accommodate your cabinet’s power cords. For EMC cabinets, see the Site
Preparation and Unpacking Guide for the 40U-C Cabinet (on the EMC Powerlink
website or the documentation CD). To support all of the storage system’s high-
availability features, you must receive power from two discrete circuits.
3. Install host bus adapters (HBAs) and appropriate drivers in any hosts that will
have data access to the storage system (if necessary). These hosts are also referred
to as servers. See the installation manuals that shipped with the HBAs or that are
available on the HBA vendor’s website.
4. Install any Fibre Channel switches and switch software on the paths between the
storage system and the servers. See the installation manuals that shipped with the
switch or that are available on the switch vendor’s website.