Dell Force10 S25-01-GE-24P Installationsanleitung Seite 79

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 124
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 78
Force10 Node Manager Guide, version 1.5.0 79
Viewing Power Supply Information
You can use Node Manager to view the status of your AC and DC Power Equipment Modules (PEMs).
Checking E1200 and E600 PEMs Visually on page 79
Displaying More E1200 and E600 Power Supply Information on page 80
Checking the Status of E300 AC Power Supplies on page 80
Checking E1200 and E600 PEMs Visually
To verify visually that your E1200 and E600 PEMs are functioning properly:
Step Icon Task
1 Locate the Status LED. If it is green, the PEM is functioning properly. If the PEM appears
like either image below, there is no PEM in that location or it is not functioning:
Figure 53 Power Equipment Module (PEM) Icons
2 If the status is some other color, consult the CLI and use the information in Appendix B,
Alarms on page 117.
Seitenansicht 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 123 124

Kommentare zu diesen Handbüchern

Keine Kommentare