
8 Dell™ PowerEdge™ 4210 Installation Guide
Installation Tasks
Installing a rack cabinet involves performing the following tasks:
1
Removing and replacing the rack doors
2
Removing and replacing the side panels
3
Reversing the front door and badge (optional)
4
Securing the leveling feet
5
Installing the stabilizer feet
6
Routing cables through the rack
7
Coupling two racks (optional)
8
Removing high-density rear door panels
Recommended Tools and Supplies
You may need the following tools and supplies to install the rack:
• #2 Phillips screwdriver
• Flat head screwdriver
• 12-mm wrench
• Needle-nose pliers
• 4-mm Allen wrench (if you want to reverse the direction that the front
door opens)
• 5-mm Allen wrench (included in kit)
• Keys to the rack doors and side panels
Removing and Replacing the Rack Doors
CAUTION: Because of the size and weight of the rack cabinet doors, never
attempt to remove or install them by yourself.
CAUTION: Store the doors where they will not injure someone if the doors
accidently fall over.
Removing the Front Door
1
Press the door-latch button to release the door handle, then open the front
door all the way (see Figure 1-1).
Kommentare zu diesen Handbüchern