Installing S25N and S25V SystemsDecember 15, 2008 100-00061-02
10 System OverviewFigure 2 The S25V Rear View fn00158s25V10-Gigabit Modules or Stacking Modules (optional)DC PowerGround ConnectorAC Power Receptacl
Installing S25N and S25V Systems 11Features• Dual power supplies:— S25N: Two 150W AC power supplies (two receptacles; see Figure 3 on page 10) acting
12 System OverviewSystem Status Chassis status can be derived in several ways, including physical LED displays and boot menu options, along with CLI s
Installing S25N and S25V Systems 13Table 3 describes the LED status indicators on the left side of the front panel. * Each of the four XFP LEDs on the
14 System Overview
Installing S25N and S25V Systems 15This chapter describes requirements and procedures to install your S25N or S25V system, in the following topics:• S
16 Site PreparationCabinet PlacementThe cabinet must meet the following criteria:• Minimum cabinet size and airflow are according to the EIA standard.
Installing S25N and S25V Systems 17Power S25NThe S25N comes standard with two 150W AC power supplies with auto-sensing 110/220V AC receptacles, each o
18 Site PreparationStoring Components If you do not install your system and components immediately, Force10 Networks recommends that you properly stor
Chapter 3 Installing the SwitchInstalling S25N and S25V Systems 19To install S25N or S25V systems, Force10 Networks recommends that you complete the i
Copyright 2008 Force10 Networks®All rights reserved. Printed in the USA. December 2008.Force10 Networks® reserves the right to change, modify, revise
20 Installing the SwitchTo install a module, follow the steps below: Step Task1If the system is on, save the running configuration, if desired (and di
Installing S25N and S25V Systems 21Installing the System on a TabletopThe system can be positioned on a stable tabletop. Four rubber standoffs are pro
22 Installing the SwitchFour-Post Rack-mounting with Threaded RailsEnsure that there is adequate clearance surrounding the cabinet or rack to permit a
Installing S25N and S25V Systems 23Four-Post Rack-mounting with Cage Nuts3 Set the adjustable rear mounting bracket to the length (one of three length
24 Installing the SwitchEnsure that there is adequate clearance surrounding the cabinet or rack to permit access and airflow. If you are installing tw
Installing S25N and S25V Systems 254 Position the cage nuts over the holes on each bracket flange and each rack post.Figure 10 Four-Post Rack-mounti
26 Installing the SwitchStackingYou can add units to a stack, remove them, renumber them, or move them in the stack. The units can continue running in
Installing S25N and S25V Systems 27Connecting Stack Ports (optional)The switch contains two expansion slots in the rear, in either of which you can in
28 Installing the SwitchConnecting Two SwitchesInsert one end of the special stacking cable into a stack port, and insert the other end into a stack p
Installing S25N and S25V Systems 29Supplying PowerSupply power to the units in a stack only after they are mounted and the stack ports are connected.
Installing S25Nand S25V Systems 3PrefaceAbout this Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30 Installing the Switch
Chapter 4 Installing Backup PowerInstalling S25N and S25V Systems 31This chapter covers the following topics:• Backup Power Components• The Power Conn
32 Installing Backup PowerThe Power Connections on the SwitchThe S25N contains two AC connections, while the S25V contains one AC and one DC. An AC ca
Installing S25N and S25V Systems 33Installing the Redundant DC Power Supply for the S25VThe Redundant Power Supply Unit (PSU) for the S25V is a 470W A
34 Installing Backup PowerInserting Tandem PSUs into a RackTo install two PSUs in tandem (side-by-side) in a rack, follow these steps: Connecting the
Installing S25N and S25V Systems 35Figure 21 DC-DC Cable for S25V PSU Follow the steps below to connect the S25V switch to the 470W PSU. Step Task1.
36 Installing Backup Power2.Insert the plastic plug of the DC-to-DC cable into the receptacle on the lower left side of the PSU (Figure 23). Note that
Chapter 5 Installing PortsInstalling S25N and S25V Systems 37This chapter contains these major sections:• Accessing the Console Port on page 37• Conne
38 Installing PortsTo make other console port configuration changes, such as setting the console port timeout or setting up access security, use the l
Installing S25N and S25V Systems 39Installing OpticsThe S25N and S25V each have four receptacles at the right end of their faceplates that accommodate
4Four-Post Rack-mounting with Cage Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23Stacking . . . . . . .
40 Installing PortsInstalling XFPsStep Task 1 Position the XFP so it is in the upright position. (The XFP has a key that prevents it from being insert
Installing S25N and S25V Systems 41Physical Design Parameter SpecificationsWeight (with only factory-installed components) 19.5 pounds (approx.) (8.85
42 System SpecificationsPower RequirementsParameter SpecificationsNominal input voltage 90 – 254 VAC, 47/63 HzMaximum current draw S25N: 2 A @ 100/120
Installing S25N and S25V Systems 43Canadian Department of Communication Statement European Union EMC Directive Conformance StatementThis product is in
44 System SpecificationsKorea (MIC certification) Safety Standards and Compliance Agency Certifications• CUS UL (60950-1, 1st Edition)• CSA 60950-1-03
Installing S25N and S25V Systems 45Product Recycling and Disposal The switch must be recycled or discarded according to applicable local and national
46 System SpecificationsTo remove the lithium closed-cell clock battery (clearly visible towards the right rear of switch):1 Insert a small, flat scre
Installing S25N and S25V Systems 47 This appendix contains these major sections:• The iSupport Website• Contacting the Technical Assistance Center on
48 Technical Support Figure 30 Support Policies section of iSupport The screenshot above shows the Support Policies section of iSupport. The Support
Installing S25N and S25V Systems 49 Contacting the Technical Assistance CenterHow to Contact Force10 TACLog in to iSupport at http://www.force10networ
Installing S25N and S25V Systems 5This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting, i
50 Technical Support Figure 31 Serial Numbers on Back of Chassis fn00163s25PLabels (Part #, Serial #, Mac Address, Bar Code, FRU #)12345671234567 1
Installing S25N and S25V Systems 51Numerics10G module serial number 5010-Gigabit module 1010-Gigabit module, inserting 1924G stack ports 27AAC Pow
52 IndexEearth ground 16electromagnetic noise 15electrostatic discharge 18, 19Emissions 44Environmental Parameters 41ESD 18, 19, 39, 40Ethernet
Installing S25N and S25V Systems 53Power over Ethernet (PoE) 11, 38power receptacle 10power source 10power supply 11power supply LED 13Power Supp
54 IndexTTable of Contents 3Tabletop Installation 21Technical Assistance Center (TAC), contacting 47Telc o rdia 41temperatureacceptable ambient r
6 About this GuideDanger: Class 1 laser product.Attention: Produit laser de classe 1Warnung: Laserprodukt der Klasse 1This equipment contains optical
Installing S25N and S25V Systems 7Related PublicationsThe S25N and S25V run FTOS version 7.7.1.0 or greater. Refer to the following documents:• FTOS C
8 About this Guide
Chapter 1 System OverviewInstalling S25N and S25V Systems 9The S25N (Cat# S25-01-GE-24T) and S25V (Cat# S25-01-GE-24V) models of the S-Series are high